WEEKLY ROAD LANE/STREET CLOSURES 
May 21 - 28, 2012
ROAD Closure = NO PARKING
Location:
3rd Ave: Broadway to
Santa Fe
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/14/2012 ‑ End Date: 6/11/2012
Time:
8:30am to 3:30pm
Purpose:
ROW Construction
Contractor:
KEENE CONCRETE
Location:
3rd Ave: Colorado Blvd
to Cherry St
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 6/30/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Colorado Blvd to
Quebec
Type:
Close 1st Traffic Lane
Date:
Start Date: 3/1/2012 ‑ End Date: 6/1/2012
Time:
8:30am to 3:30pm
Purpose:
Tree Trimming
Contractor:
Swingle Lawn, Tree & Landscape Care
Location:
6th Ave: Fairfax St to
Glencoe St
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave Pkwy: Forest
St to Dahlia St
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/1/2012 ‑ End Date: 6/8/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Forest St to
Grape St
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Glencoe St to
Hudson St
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Grape St to Holly St
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Holly St to
Ivy Ln
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Hudson St to
Crestmoor Dr
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Crestmoor Dr
to Ivy Ln (east)
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Ivy Ln (west)
to Jasmine St
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Ivy Ln to
Krameria St
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
6th Ave: Fox to
Delaware
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 6/1/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
6th Ave & Fox
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/10/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
12th Ave W.B. east of
Colorado Blvd
Type:
Close 3rd Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 6/6/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
INTERFACE COMMUNICATION COMPANY
Location:
13th Ave: Sherman to
Broadway
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/19/2012
Time:
7:30am TO 6:30pm
Purpose:
ROW Construction
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
13th Ave: Quivas to
Shoshone
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/21/2012
Time:
8:30am to 3:30pm
Purpose:
ROW Occupancy
Contractor:
QWEST ‑ NORTH OF ALAMEDA
Location:
13th Ave: Rio to Osage
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/14/2012 ‑ End Date: 5/19/2012
Time:
Purpose:
Boring &/or Wells
Contractor:
SAGE TELECOMMUNICATIONS CORP
Location:
14th Ave: Meade to
Lowell Blvd
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/23/2012 ‑ End Date: 5/23/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
14th Ave:
Bannock/Delaware & Galapago/Elati
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/1/2012 ‑ End Date: 5/31/2012
Time:
8:30am to 3:30pm
Purpose:
Boring &/or Wells
Contractor:
XCEL ENERGY‑NORTH METRO
Location:
14th Ave: Eudora St to
Fairfax St
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/14/2012 ‑ End Date: 6/4/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
14th St: Market to
Colfax
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/1/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Site Work
Contractor:
CONCRETE WORKS OF COLORADO INC
Location:
15th St: Boulder St to
Platte St
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane, Peak Lane Closure
Date:
Start Date: 1/16/2012 ‑ End Date: 12/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
CDOT
Location:
15th St: Central to
Boulder
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
RIO LLC
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/24/2012 ‑ End Date: 5/24/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
RIO LLC
Location:
16th St: Boulder to
Central
Type:
Peak Lane Closure
Date:
Start Date: 10/17/2011 ‑ End Date: 10/17/2012
Time:
8:30am to 3:30pm 24 hrs/day
Purpose:
ROW Occupancy
Contractor:
HOLLAND CONSTRUCTION
Location:
16th St: Tremont to
Court Pl
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/21/2012
Time:
9pm to 6am
Purpose:
Road / Alley Repair
Contractor:
GALLEGOS CORPORATION (THE)
Location:
17th St N.B.: Wewatta
to Chestnut
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 12/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
KIEWIT WESTERN CO
Location:
17th St S.B.: Chestnut to Wewatta
Type:
Close 1st Traffic Lane, Peak Lane Closure
Date:
Start Date: 1/1/2012 ‑ End Date: 12/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
KIEWIT WESTERN CO
Location:
17th St: Wynkoop to
Wazee
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane,
Road Closure
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
7:00am ‑ 12:00pm
Purpose:
Special Event
Contractor:
Lower Downtown Denver Arts Association
Location:
17th St: Tremont to
Broadway
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/22/2012
Time:
24 hrs/day
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑STEAM HEAT & DISTRICT COOLIN
Location:
18th Ave: Sherman to
Lincoln
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/19/2012
Time:
Weekends 7:00am to 10:00pm
Purpose:
Fiber Optics
Contractor:
SAGE TELECOMMUNICATIONS CORP
Location:
18th Ave: Sherman to
Lincoln
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/19/2012
Time:
Weekends 7:00am to 10:00pm
Purpose:
Fiber Optics
Contractor:
SAGE TELECOMMUNICATIONS CORP
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/20/2012
Time:
Weekends 7:00am to 10:00pm
Purpose:
Fiber Optics
Contractor:
SAGE TELECOMMUNICATIONS CORP
Location:
18th Ave: Sherman to
Lincoln
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/20/2012 ‑ End Date: 5/20/2012
Time:
Weekends 7:00am to 10:00pm
Purpose:
Fiber Optics
Contractor:
SAGE TELECOMMUNICATIONS CORP
Location:
18th Ave: Washington
to Pearl
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/21/2012
Time:
8:30am to 3:30pm
Purpose:
Fiber Optics
Contractor:
SAGE TELECOMMUNICATIONS CORP
Location:
18th Ave: Downing to
Emerson
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
W L CONTRACTORS INC
Location:
19th Ave: Emerson to
Ogden
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
W L CONTRACTORS INC
Location:
20th Ave: Clarkson to
Washington
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
W L CONTRACTORS INC
Location:
21st St: Lawrence to
Arapahoe
Type:
Close 1st Traffic Lane,
Road
Closure
Date:
Start Date: 5/21/2012 ‑ End Date: 5/22/2012
Time:
7:00 am to 7:00 pm
Purpose:
ROW Occupancy
Contractor:
SHAW BUILDERS LLC
Location:
38th Ave: Tennyson to
Sheridan
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 6/19/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
40th Ave at Central
Park Blvd.
Type:
Close 1st Traffic Lane
Date:
Start Date: 3/21/2012 ‑ End Date: 6/22/2012
Time:
Purpose:
Street Cut/Water
Contractor:
REYNOLDS‑TIERDAEL
Location:
46th Ave: Tejon to
Shoshone
Type: Close 1st Traffic Lane
Date:
Start Date: 5/23/2012 ‑ End Date: 5/23/2012
Time:
8:30am to 3:30pm
Purpose:
Site Improvements
Contractor:
SHAW BUILDERS LLC
Location:
48th Ave intersection
of Steele St
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
DENVER WATER BOARD
Location:
56th Ave E.B.: Havana
to Valentia
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 6/30/2012
Time:
24 hrs/day
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
56th Ave W.B.: Havana
to Valentia
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 6/30/2012
Time:
24 hrs/day
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
56th Ave (Shoulders
Only): Quebec to Havana
Type:
Peak Lane Closure
Date:
Start Date: 2/21/2011 ‑ End Date: 6/21/2012
Time:
24 hrs/day
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
56th Ave: Spruce to
Havana
Type:
Close 1st Traffic Lane, Peak Lane Closure
Date:
Start Date: 2/9/2012 ‑ End Date: 6/24/2012
Time:
24 hrs/day
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Arapahoe St: 17th St.
to 15th St
Type:
Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane,
Road Closure
Date:
Start Date: 5/26/2012 ‑ End Date: 5/27/2012
Time:
3:00 am ‑ 12:01 am
Purpose:
Special Event
Contractor:
Concert for Kids
Location:
Arapahoe: 17th St to
16th St
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/23/2012 ‑ End Date: 5/23/2012
Time:
1pm ‑ 4pm
Purpose:
Special Event
Contractor:
Professional Chef Association
Location:
Bannock: 10th Ave to
11th Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Belleview Ave: I-225 & Monaco to
Yosemite
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 12/31/2012
Time:
8:30am to 3:30pm
Purpose:
Site Work
Contractor:
GOLDSMITH METROPOLITAN DISTRICT
Location:
Belleview Ave: Monaco to Quebec
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/28/2012 ‑ End Date: 6/25/2012
Time:
CDOT 9am‑3pm
Purpose:
Site Work
Contractor:
ValleyCrest Landscape Maintenance
Location:
Boulder: 15th to 16th
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/17/2012 ‑ End Date: 5/31/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
RIO LLC
Location:
Broadway: 16th to
Colfax
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/12/2012 ‑ End Date: 5/12/2013
Time:
7:00am ‑ 3:30pm
Purpose:
Site Improvements
Contractor:
KECI COLORADO INC
Location:
Broadway: 18th to 17th
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/22/2012
Time:
24 hrs/day
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑STEAM HEAT & DISTRICT COOLING
Location:
Broadway N.B.: Harvard to Evans
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/19/2012 ‑ End Date: 6/19/2012
Time:
24 hrs/day
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Broadway: Asbury to Warren -
north & southbound
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 5/21/2012
Time:
24 hrs/day 6:30 pm to 5:30am
Purpose:
ROW Occupancy
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Broadway: Asbury to Warren
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/30/2012 ‑ End Date: 6/30/2012
Time:
8:30am to 3:30pm
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Broadway: Warren to Asbury
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 9/30/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Central St: 15th St to
20th St
Type:
Peak Lane Closure
Date:
Start Date: 1/16/2012 ‑ End Date: 12/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
CDOT
Location:
Champa: 17th St. to 15th
St.
Type:
Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane,
Road Closure
Date:
Start Date: 5/26/2012 ‑ End Date: 5/27/2012
Time:
3:00 am ‑ 12:01 am
Purpose:
Special Event
Contractor:
Concert for Kids
Location:
Cherry St & Birch St: 4th
Ave to 3rd Ave
Type:
Close 1st Traffic Lane,
Road
Closure
Date:
Start Date: 5/19/2012 ‑ End Date: 6/30/2012
Time:
7:00am to 10:00pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
Colfax Ave ‑ 7171 east ‑ north
side of Colfax between Poplar & Pontiac
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/21/2012
Time:
8:30am to 3:30pm
Purpose:
ROW Occupancy
Contractor:
BROOMFIELD SIGN COMPANY INC
Location:
Colfax Ave: Fairfax St to Elm St,
turn lane
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/14/2012 ‑ End Date: 6/4/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Colfax Ave W.B.: Columbine to
Clarkson
Type:
Close 1st Traffic Lane
Date:
Start Date: 3/21/2012 ‑ End Date: 5/19/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
KECI COLORADO INC
Location:
Colfax Ave E.B.: Clarkson to
Downing
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/10/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
KECI COLORADO INC
Location:
Colfax Ave W.B.: Clarkson to
Pearl
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 5/19/2012
Time:
8:30am to 3:30pm
Purpose:
Site Work
Contractor:
KECI COLORADO INC
Location:
Colfax Ave W.B.: Pearl to Grant
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/25/2012 ‑ End Date: 5/19/2012
Time:
8:30am to 3:30pm
Purpose:
Site Work
Contractor:
KECI COLORADO INC
Location:
Colfax Ave W.B.: Court to Welton
Type: Close 1st Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 6/1/2012
Time:
8:30am to 3:30pm
Purpose:
Site Improvements
Contractor:
KECI COLORADO INC
Location:
Colfax Ave E.B.: Speer Blvd to
Broadway
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 6/1/2012
Time:
8:30am to 3:30pm
Purpose:
Site Improvements
Contractor:
KECI COLORADO INC
Location:
Colfax Ave: Speer Blvd to
Broadway
Type:
Close 1st Traffic Lane
Date:
Start Date: 2/23/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Boring &/or Wells
Contractor:
XCEL ENERGY‑NORTH METRO
Location:
Colfax Ave W.B.: Irving to Julian
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/11/2012 ‑ End Date: 5/28/2012
Time:
8:30am to 3:30pm
Purpose:
Site Improvements
Contractor:
T2 CONSTRUCTION INC
Location:
Colfax Ave E.B.: Julian to Irving
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/11/2012 ‑ End Date: 5/28/2012
Time:
8:30am to 3:30pm
Purpose:
Site Improvements
Contractor:
T2 CONSTRUCTION INC
Location:
Colfax Ave W.B.: Yates to
Sheridan
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/11/2012 ‑ End Date: 5/28/2012
Time:
8:30am to 3:30pm
Purpose:
Site Improvements
Contractor:
T2 CONSTRUCTION INC
Location:
Colfax Ave E.B.: Sheridan to
Yates
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/11/2012 ‑ End Date: 5/28/2012
Time:
8:30am to 3:30pm 6:00pm to 10:00pm
Purpose:
Site Improvements
Contractor:
T2 CONSTRUCTION INC
Location:
Colorado Blvd & I‑70 E.B. off
ramp
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/7/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
INTERFACE COMMUNICATION COMPANY
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/7/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
INTERFACE COMMUNICATION COMPANY
Location:
Colorado Blvd north & south of 12th
Ave intersection
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 6/6/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
INTERFACE COMMUNICATION COMPANY
Type:
Close 3rd Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 6/6/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
INTERFACE COMMUNICATION COMPANY
Location:
Colorado Blvd south of 12th
Ave intersection
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 6/6/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
INTERFACE COMMUNICATION COMPANY
Location:
Colorado Blvd S.B. left turn at 12th
Ave intersection
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 6/6/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
INTERFACE COMMUNICATION COMPANY
Location:
Colorado Blvd: 2nd Ave
to 4th Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 6/30/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
Colorado Blvd: Iliff to Warren
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/23/2012
Time:
CDOT 9am‑3pm
Purpose:
Site Work
Contractor:
Eagle Environmental Consulting
Location:
Corona: Speer Blvd N.B. to Speer
Blvd S.B.
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 5/19/2012
Time:
7P 5/18 ‑ 4P 5/19
Purpose:
Bridge Construction
Contractor:
ABCO CONTRACTING INC
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/20/2012
Time:
4PM 5/19 ‑ 12PM 5/20
Purpose:
Bridge Construction
Contractor:
ABCO CONTRACTING INC
Location:
Court Pl: 16th to
Broadway
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/22/2012
Time:
24 hrs/day
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑STEAM HEAT & DISTRICT COOLING
Location:
Curtis St: 15th St. to
17th St.
Type: Close 1st Traffic Lane, 2nd Traffic Lane, 3rd
Traffic Lane,
Road Closure
Date:
Start Date: 5/26/2012 ‑ End Date: 5/27/2012
Time:
3:00 am ‑ 12:01 am
Purpose:
Special Event
Contractor:
Concert for Kids
Location:
Delaware: 5th Ave to 7th
Ave
Type: Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 6/1/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
Downing: 18th Ave to
22nd Ave
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane,
Road Closure
Date:
Start Date: 5/19/2012 ‑ End Date: 5/20/2012
Time:
24 hrs/day
Purpose:
Paving
Contractor:
MARTIN MARIETTA MATERIALS
Location:
Downing: Speer Blvd N.B. to Speer
Blvd S.B.
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 5/19/2012
Time:
7P 5/18 ‑ 4P 5/19
Purpose:
Bridge Construction
Contractor:
ABCO CONTRACTING INC
Location:
Eastman Ave: Tamarac to Rosemary
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
EXCEL ENERGY‑SOUTHEAST METRO
Location:
Elati: 6th Ave to 7th
Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 6/1/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
Elm St: Colfax Ave to 13th
Ave
Type:
Close 1st Traffic Lane,
Road Closure
Date:
Start Date: 5/14/2012 ‑ End Date: 6/4/2012
Time:
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Evans Ave: Acoma to Lincoln –
east and westbound
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 5/21/2012
Time:
24 hrs/day 6:30 pm to 5:30am
Purpose:
ROW Occupancy
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Evans Ave E.B.: Acoma to Lincoln
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 9/30/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Evans Ave: Acoma to Lincoln
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/30/2012 ‑ End Date: 6/30/2012
Time:
8:30am to 3:30pm
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Evans Ave W.B.: Lincoln to
Broadway
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 9/30/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Evans Ave E.B.: Bannock to
Galapago
Type: Close 1st Traffic Lane
Date:
Start Date: 5/2/2012 ‑ End Date: 5/21/2012
Time:
8:30am to 3:30pm
Purpose:
ROW Occupancy
Contractor:
XCEL ENERGY‑NORTH METRO
Location:
Evans Ave W.B.: Bannock to
Galapago
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/2/2012 ‑ End Date: 5/21/2012
Time:
8:30am to 3:30pm
Purpose:
ROW Occupancy
Contractor:
XCEL ENERGY‑NORTH METRO
Location:
Evans Ave E. B.: Cherokee to
Broadway
Type:
Close 1st Traffic Lane
Date:
Start Date: 2/27/2012 ‑ End Date: 6/30/2012
Time:
24 hrs/day
Purpose:
ROW Occupancy
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Evans Ave W.B.: Galapago to Lipan
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/25/2012 ‑ End Date: 5/31/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑NORTH METRO
Location:
Federal Blvd: Tennessee to
Mississippi
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
Florida: Lowell to Meade
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane
Date:
Start Date: 5/28/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Contractor:
WATER BOARD
Location:
Gaylord intersection of Bruce Randolph
Pl
Type: Close 1st Traffic Lane
Date:
Start Date: 5/23/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Glenarm: 15th to 17th
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane,
Road
Closure
Date:
Start Date: 5/25/2012 ‑ End Date: 5/28/2012
Time:
24 hrs/day 12am Fri‑11:59pm Mon
Purpose:
Special Event
Contractor:
Downtown Denver Arts Fest ‑ Dancing Kids
Location:
Havana St S.B.: 56th
Ave to 54th Ave
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane
Date:
Start Date: 3/27/2012 ‑ End Date: 6/30/2012
Time:
24 hrs/day
Purpose:
ROW Construction
Contractor:
CASTLE ROCK CONSTRUCTION COMPANY
Location:
Havana St ‑ 3710 north ‑ south of
Smith Road back to bridge
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane, Close 3rd Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 6/22/2012
Time:
24 hrs/day
Purpose:
Road / Alley Repair
Contractor:
FCI CONSTRUCTORS INC
Location:
Havana St at 37th Ave
Type:
Close 2nd Traffic Lane, Close 3rd Traffic Lane
Date:
Start Date: 2/6/2012 ‑ End Date: 5/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
REYNOLDS‑TIERDAEL
Location:
Havana St S.B. at 37th
Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 2/6/2012 ‑ End Date: 5/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
REYNOLDS‑TIERDAEL
Location:
Holly St: 6th Ave to
Severn Pl
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
Holly St: Severn Pl to 4th
Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/11/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MAINLINING SERVICE INC
Location:
Irving: 19th to 20th
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/21/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Kalamath: Speer Blvd to Colfax
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Utility
Contractor:
STURGEON ELECTRIC COMPANY INC
Location:
Lawrence St: 20th to
21st
Type: Peak Lane Closure
Date:
Start Date: 3/3/2012 ‑ End Date: 7/2/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
SHAW BUILDERS LLC
Location:
Leetsdale Drive at Monaco
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 6/4/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
NORAA CONCRETE CONSTRUCTION CORP
Location:
Lincoln: 12th Ave to
13th Ave
Type: Close 2nd Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/19/2012
Time:
7:30am to 6:30pm
Purpose:
ROW Construction
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Lincoln: 12th Ave to
14th Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/19/2012
Time:
7:30am to 6:30pm
Purpose:
ROW Construction
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Louisiana: Logan to Washington
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/17/2012 ‑ End Date: 6/15/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Sewer
Contractor:
BT CONSTRUCTION INC
Location:
Lowell Blvd: Mexico to Florida
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/4/2012 ‑ End Date: 6/8/2012
Time:
8:30am to 3:30pm
Purpose:
Contractor:
WATER BOARD
Location:
Mariposa at 9th Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/14/2012 ‑ End Date: 5/19/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
RANDY KNEEBONE EXCAVATING & TRUCKING INC
Location:
Milwaukee intersection of E 26th
Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/30/2012 ‑ End Date: 8/3/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
WATER BOARD
Location:
Milwaukee intersection of E 29th
Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
WATER BOARD
Location:
Mississippi: Federal Blvd to
Platte River Dr.
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
Mississippi: Federal Blvd to Zuni
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
Mississippi: Zuni to Platte River
Dr
Type:
Close 1st Traffic Lane
Date:
Start Date: 4/16/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
COLORADO BORING CO
Location:
Monaco Pkwy at Narcissus Wy
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
EXCEL ENERGY‑SOUTHEAST METRO
Location:
Monaco Pkwy: Tennessee to
Exposition Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 6/4/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
NORAA CONCRETE CONSTRUCTION CORP
Location:
Monaco: Belleview to Union
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/28/2012 ‑ End Date: 6/25/2012
Time:
8:30am to 3:30pm
Purpose:
Site Work
Contractor:
ValleyCrest Landscape Maintenance
Location:
Park Ave: 19th Ave to
Cleveland
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
W L CONTRACTORS INC
Location:
Park Ave: Court to Glenarm
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/14/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
W L CONTRACTORS INC
Location:
Park Ave: Downing to Emerson
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/25/2012
Time:
Purpose:
Traffic Signal Installation
Contractor:
W L CONTRACTORS INC
Location:
Park Ave: Ogden to Clarkson
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/25/2012
Time:
8:30am to 3:30pm
Purpose:
Traffic Signal Installation
Contractor:
W L CONTRACTORS INC
Location:
Park Ave West: Larimer to Walnut
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Weekends 7:00am to 10:00pm
Purpose: Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/26/2012 ‑ End Date: 5/26/2012
Time:
Weekends 7:00am to 10:00pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Patton Court: Exposition Ave. to
Mississippi Ave.
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/23/2012 ‑ End Date: 6/20/2012
Time:
8:30am to 3:30pm
Purpose:
Rotomill / Overlay
Contractor:
STREET MAINTENANCE‑DEPT OF PUBLIC WORKS
Location:
Pearl: Colorado Ave to Jewell
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/9/2012 ‑ End Date: 5/23/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
Platte St: 15th to 16th
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/23/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Sewer
Contractor:
COLORADO PIPE AND CONCRETE
Location:
Speer Blvd S.B.: Kalamath to
Stout
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Utility
Contractor:
STURGEON ELECTRIC COMPANY INC
Location:
Speer Blvd S.B.: Clarkson to
Lafayette
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/19/2012 ‑ End Date: 5/20/2012
Time:
4PM 5/19 ‑ 12PM 5/20
Purpose:
Bridge Construction
Contractor:
ABCO CONTRACTING INC
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 5/19/2012
Time:
7P 5/18 ‑ 4P 5/19
Purpose:
Bridge Construction
Contractor:
ABCO CONTRACTING INC
Location:
Speer Blvd S.B.: Corona to
Lafayette
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/18/2012 ‑ End Date: 5/19/2012
Time:
7P 5/18 ‑ 4P 5/19
Purpose:
Bridge Construction
Contractor:
ABCO CONTRACTING INC
Location:
Syracuse St. ‑ 3201 north‑ north
side of round‑a‑bout
Type: Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/29/2012
Time:
8:30am to 3:30pm
Purpose:
Fiber Optics
Contractor:
SAGE TELECOMMUNICATIONS CORP
Location:
Tufts Ave: DTC Blvd to Ulster
Type: Close 1st Traffic Lane
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Cable
Contractor:
R C UTILITY CORPORATION
Location:
Union Ave: Syracuse to Newport
Type: Close 1st Traffic Lane, Close 2nd Traffic Lane,
Close 3rd Traffic Lane
Date:
Start Date: 10/28/2011 ‑ End Date: 8/31/2012
Time:
24 hrs/day
Purpose:
Bridge Construction
Contractor:
EDWARD KRAEMER & SONS INC
Location:
Union Ave E.B.: Quebec to
Syracuse
Type: Close 1st Traffic Lane
Date:
Start Date: 9/23/2011 ‑ End Date: 8/31/2012
Time:
24 hrs/day
Purpose:
Bridge Construction
Contractor:
Edward Kraemer & Sons, Inc
Location:
Union Ave W.B.: Syracuse to
Quebec
Type:
Close 1st Traffic Lane
Date:
Start Date: 9/22/2011 ‑ End Date: 8/31/2012
Time:
7a‑3:30p & 6p‑5a
Purpose:
Bridge Construction
Contractor:
Edward Kraemer & Sons, Inc
Location:
University Blvd: Alameda to
Columbia Pl.
Type: Close 1st Traffic Lane
Date:
Start Date: 1/30/2012 ‑ End Date: 5/30/2012
Time:
8:30am to 3:30pm
Purpose:
Tree Trimming
Contractor:
Colorado Tree Shrubbery Specialists
Location:
University Blvd: 1st
Ave to Alameda
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Bridge Construction
Contractor:
STRUCTURES INC
Type:
Close 2nd Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/26/2012
Time:
8:30am to 3:30pm
Purpose:
Bridge Construction
Contractor:
STRUCTURES INC
Location:
University Blvd: Evans to Warren
Type:
Peak Lane Closure
Date:
Start Date: 5/23/2011 ‑ End Date: 11/30/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
SHAW BUILDERS LLC
Location:
Welton: 15th St. to 17th
St.
Type:
Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane,
Road
Closure
Date:
Start Date: 5/26/2012 ‑ End Date: 5/27/2012
Time:
3:00 am ‑ 12:01 am
Purpose:
Special Event
Contractor:
Concert for Kids
Location:
Welton: 26th to
Downing
Type:
Close 1st Traffic Lane, Close 2nd Traffic Lane,
Road
Closure
Date:
Start Date: 5/18/2012 ‑ End Date: 5/19/2012
Time:
8pm 5/19 ‑ 8pm 5/19
Purpose:
Special Event
Contractor:
Colours TV
Location:
Wewatta E.B.: 16th St
to 19th St
Type:
Close 1st Traffic Lane
Date:
Start Date: 1/1/2012 ‑ End Date: 12/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
KIEWIT WESTERN CO
Location:
Wewatta W.B.: 19th St
to 16th St
Type:
Close 1st Traffic Lane, Peak Lane Closure
Date:
Start Date: 1/1/2012 ‑ End Date: 12/31/2012
Time:
24 hrs/day
Purpose:
Site Work
Contractor:
KIEWIT WESTERN CO
Location:
York: Colfax to 13th
Ave
Type: Close 1st Traffic Lane
Date:
Start Date: 5/22/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Utilities
Contractor:
XCEL ENERGY‑CENTRAL METRO
Location:
York at 40th Ave
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/16/2012 ‑ End Date: 5/21/2012
Time:
8:30am to 3:30pm No
Weekends
Purpose:
Pot Holing
Contractor:
DENVER TRANSIT CONSTRUCTORS LLC
Location:
Zuni: 27th to 29th
Type:
Close 1st Traffic Lane
Date:
Start Date: 5/21/2012 ‑ End Date: 5/22/2012
Time:
8:30am to 3:30pm
Purpose:
Street Cut/Water
Contractor:
MENDOZA DEMOLITION SERVICES INC
IMPORTANT: all information on this update is subject to change based on weather conditions.