WEEKLY ROAD LANE/STREET CLOSURES 

           May 21 - 28, 2012


ROAD Closure = NO PARKING

 

            Location:         3rd Ave: Broadway to Santa Fe

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        KEENE CONCRETE

 

            Location:         3rd Ave: Colorado Blvd to Cherry St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Colorado Blvd to Quebec

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 3/1/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Tree Trimming

            Contractor:        Swingle Lawn, Tree & Landscape Care

 

            Location:         6th Ave: Fairfax St to Glencoe St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave Pkwy: Forest St to Dahlia St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/1/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

           

            Location:         6th Ave: Forest St to Grape St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Glencoe St to Hudson St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Grape St to Holly St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Holly St to Ivy Ln

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Hudson St to Crestmoor Dr

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Crestmoor Dr to Ivy Ln (east)

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Ivy Ln (west) to Jasmine St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Ivy Ln to Krameria St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

            Location:         6th Ave: Fox to Delaware

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         6th Ave & Fox

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/10/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO


            Location:         12th Ave W.B. east of Colorado Blvd

            Type:                Close 3rd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         13th Ave: Sherman to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/19/2012

            Time:                7:30am TO 6:30pm

            Purpose:           ROW Construction

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         13th Ave: Quivas to Shoshone

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/21/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Occupancy

            Contractor:        QWEST ‑ NORTH OF ALAMEDA

 

            Location:         13th Ave: Rio to Osage

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 5/19/2012

            Time:

            Purpose:           Boring &/or Wells

            Contractor:        SAGE TELECOMMUNICATIONS CORP

           

            Location:         14th Ave: Meade to Lowell Blvd

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 5/23/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         14th Ave: Bannock/Delaware & Galapago/Elati

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/1/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Boring &/or Wells

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         14th Ave: Eudora St to Fairfax St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         14th St: Market to Colfax

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/1/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        CONCRETE WORKS OF COLORADO INC

 

            Location:         15th St: Boulder St to Platte St

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Peak Lane Closure

            Date:                Start Date: 1/16/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        CDOT

 

            Location:         15th St: Central to Boulder

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        RIO LLC

 

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 5/24/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        RIO LLC

 

            Location:         16th St: Boulder to Central

            Type:                Peak Lane Closure

            Date:                Start Date: 10/17/2011 ‑ End Date: 10/17/2012

            Time:                8:30am to 3:30pm 24 hrs/day

            Purpose:           ROW Occupancy

            Contractor:        HOLLAND CONSTRUCTION

 

            Location:         16th St: Tremont to Court Pl

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/21/2012

            Time:                9pm to 6am

            Purpose:           Road / Alley Repair

            Contractor:        GALLEGOS CORPORATION (THE)

 

            Location:         17th St N.B.: Wewatta to Chestnut

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         17th St S.B.: Chestnut to Wewatta

            Type:                Close 1st Traffic Lane, Peak Lane Closure

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         17th St: Wynkoop to Wazee

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                7:00am ‑ 12:00pm

            Purpose:           Special Event

            Contractor:        Lower Downtown Denver Arts Association

 

            Location:         17th St: Tremont to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/22/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑STEAM HEAT & DISTRICT COOLIN

 

            Location:         18th Ave: Sherman to Lincoln

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/19/2012

            Time:                Weekends 7:00am to 10:00pm

            Purpose:           Fiber Optics

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Location:         18th Ave: Sherman to Lincoln

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/19/2012

            Time:                Weekends 7:00am to 10:00pm

            Purpose:           Fiber Optics

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/20/2012

            Time:                Weekends 7:00am to 10:00pm

            Purpose:           Fiber Optics

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Location:         18th Ave: Sherman to Lincoln

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/20/2012 ‑ End Date: 5/20/2012

            Time:                Weekends 7:00am to 10:00pm

            Purpose:           Fiber Optics

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Location:         18th Ave: Washington to Pearl

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/21/2012

            Time:                8:30am to 3:30pm

            Purpose:           Fiber Optics

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Location:         18th Ave: Downing to Emerson

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        W L CONTRACTORS INC

 

            Location:         19th Ave: Emerson to Ogden

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        W L CONTRACTORS INC

 

            Location:         20th Ave: Clarkson to Washington

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        W L CONTRACTORS INC

 

            Location:         21st St: Lawrence to Arapahoe

            Type:                Close 1st Traffic Lane, Road Closure

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/22/2012

            Time:                7:00 am to 7:00 pm

            Purpose:           ROW Occupancy

            Contractor:        SHAW BUILDERS LLC

 

            Location:         38th Ave: Tennyson to Sheridan

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/19/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         40th Ave at Central Park Blvd.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 3/21/2012 ‑ End Date: 6/22/2012

            Time:

            Purpose:           Street Cut/Water

            Contractor:        REYNOLDS‑TIERDAEL

 

            Location:         46th Ave: Tejon to Shoshone

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 5/23/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        SHAW BUILDERS LLC

 

            Location:         48th Ave intersection of Steele St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        DENVER WATER BOARD

 

            Location:         56th Ave E.B.: Havana to Valentia

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         56th Ave W.B.: Havana to Valentia

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         56th Ave (Shoulders Only): Quebec to Havana

            Type:                Peak Lane Closure

            Date:                Start Date: 2/21/2011 ‑ End Date: 6/21/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         56th Ave: Spruce to Havana

            Type:                Close 1st Traffic Lane, Peak Lane Closure

            Date:                Start Date: 2/9/2012 ‑ End Date: 6/24/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         Arapahoe St: 17th St. to 15th St

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Arapahoe: 17th St to 16th St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 5/23/2012

            Time:                1pm ‑  4pm

            Purpose:           Special Event

            Contractor:        Professional Chef Association

 

            Location:         Bannock: 10th Ave to 11th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Belleview Ave: I-225 & Monaco to Yosemite

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        GOLDSMITH METROPOLITAN DISTRICT

 

            Location:         Belleview Ave: Monaco to Quebec

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 6/25/2012

            Time:                CDOT 9am‑3pm

            Purpose:           Site Work

            Contractor:        ValleyCrest Landscape Maintenance

 

            Location:         Boulder: 15th to 16th

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/17/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        RIO LLC

 

            Location:         Broadway: 16th to Colfax

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/12/2012 ‑ End Date: 5/12/2013

            Time:                7:00am ‑ 3:30pm

            Purpose:           Site Improvements

            Contractor:        KECI COLORADO INC

 

            Location:         Broadway: 18th to 17th

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/22/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑STEAM HEAT & DISTRICT COOLING

 

            Location:         Broadway N.B.: Harvard to Evans

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/19/2012 ‑ End Date: 6/19/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Broadway: Asbury to Warren - north & southbound

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 5/21/2012

            Time:                24 hrs/day 6:30 pm to 5:30am

            Purpose:           ROW Occupancy

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         Broadway: Asbury to Warren

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/30/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         Broadway: Warren to Asbury

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 9/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Central St: 15th St to 20th St

            Type:                Peak Lane Closure

            Date:                Start Date: 1/16/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        CDOT

 

            Location:         Champa: 17th St. to 15th St.

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Cherry St & Birch St: 4th Ave to 3rd Ave

            Type:                Close 1st Traffic Lane, Road Closure

            Date:                Start Date: 5/19/2012 ‑ End Date: 6/30/2012

            Time:                7:00am to 10:00pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         Colfax Ave ‑ 7171 east ‑ north side of Colfax between Poplar & Pontiac

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/21/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Occupancy

            Contractor:        BROOMFIELD SIGN COMPANY INC

 

            Location:         Colfax Ave: Fairfax St to Elm St, turn lane

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Colfax Ave W.B.: Columbine to Clarkson

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 3/21/2012 ‑ End Date: 5/19/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave E.B.: Clarkson to Downing

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/10/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave W.B.: Clarkson to Pearl

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/19/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave W.B.: Pearl to Grant

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/25/2012 ‑ End Date: 5/19/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave W.B.: Court to Welton

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave E.B.: Speer Blvd to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave: Speer Blvd to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 2/23/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Boring &/or Wells

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         Colfax Ave W.B.: Irving to Julian

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colfax Ave E.B.: Julian to Irving

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colfax Ave W.B.: Yates to Sheridan

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colfax Ave E.B.: Sheridan to Yates

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm 6:00pm to 10:00pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colorado Blvd & I‑70 E.B. off ramp

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/7/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/7/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         Colorado Blvd north & south of 12th Ave intersection

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Type:                Close 3rd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         Colorado Blvd south of 12th Ave intersection

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         Colorado Blvd S.B. left turn at 12th Ave intersection

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         Colorado Blvd: 2nd Ave to 4th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         Colorado Blvd: Iliff to Warren

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/23/2012

            Time:                CDOT 9am‑3pm

            Purpose:           Site Work

            Contractor:        Eagle Environmental Consulting

 

            Location:         Corona: Speer Blvd N.B. to Speer Blvd S.B.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 5/19/2012

            Time:                7P 5/18 ‑ 4P 5/19

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

           

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/20/2012

            Time:                4PM 5/19 ‑ 12PM 5/20

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

 

            Location:         Court Pl: 16th to Broadway

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/22/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑STEAM HEAT & DISTRICT COOLING

 

            Location:         Curtis St: 15th St. to 17th St.

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Delaware: 5th Ave to 7th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Downing: 18th Ave to 22nd Ave

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/20/2012

            Time:                24 hrs/day

            Purpose:           Paving

            Contractor:        MARTIN MARIETTA MATERIALS

 

            Location:         Downing: Speer Blvd N.B. to Speer Blvd S.B.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 5/19/2012

            Time:                7P 5/18 ‑ 4P 5/19

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

 

            Location:         Eastman Ave: Tamarac to Rosemary

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        EXCEL ENERGY‑SOUTHEAST METRO

 

            Location:         Elati: 6th Ave to 7th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Elm St: Colfax Ave to 13th Ave

            Type:                Close 1st Traffic Lane, Road Closure

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/4/2012

            Time:

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Evans Ave: Acoma to Lincoln – east and westbound

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 5/21/2012

            Time:                24 hrs/day 6:30 pm to 5:30am

            Purpose:           ROW Occupancy

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Evans Ave E.B.: Acoma to Lincoln

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 9/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Evans Ave: Acoma to Lincoln

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/30/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         Evans Ave W.B.: Lincoln to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 9/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Evans Ave E.B.: Bannock to Galapago

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/2/2012 ‑ End Date: 5/21/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Occupancy

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         Evans Ave W.B.: Bannock to Galapago

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/2/2012 ‑ End Date: 5/21/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Occupancy

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         Evans Ave E. B.: Cherokee to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 2/27/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Occupancy

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Evans Ave W.B.: Galapago to Lipan

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/25/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         Federal Blvd: Tennessee to Mississippi

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Florida: Lowell to Meade

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:

            Contractor:        WATER BOARD

 

            Location:         Gaylord intersection of Bruce Randolph Pl

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Glenarm: 15th to 17th

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/25/2012 ‑ End Date: 5/28/2012

            Time:                24 hrs/day 12am Fri‑11:59pm Mon

            Purpose:           Special Event

            Contractor:        Downtown Denver Arts Fest ‑ Dancing Kids

 

            Location:         Havana St S.B.: 56th Ave to 54th Ave

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 3/27/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Havana St ‑ 3710 north ‑ south of Smith Road back to bridge

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Close 3rd Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 6/22/2012

            Time:                24 hrs/day

            Purpose:           Road / Alley Repair

            Contractor:        FCI CONSTRUCTORS INC

 

            Location:         Havana St at 37th Ave

            Type:                Close 2nd Traffic Lane, Close 3rd Traffic Lane

            Date:                Start Date: 2/6/2012 ‑ End Date: 5/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        REYNOLDS‑TIERDAEL

 

            Location:         Havana St S.B. at 37th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 2/6/2012 ‑ End Date: 5/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        REYNOLDS‑TIERDAEL

 

            Location:         Holly St: 6th Ave to Severn Pl

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         Holly St: Severn Pl to 4th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/11/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         Irving: 19th to 20th

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/21/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Kalamath: Speer Blvd to Colfax

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Utility

            Contractor:        STURGEON ELECTRIC COMPANY INC

 

            Location:         Lawrence St: 20th to 21st

            Type:                Peak Lane Closure

            Date:                Start Date: 3/3/2012 ‑ End Date: 7/2/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        SHAW BUILDERS LLC

 

            Location:         Leetsdale Drive at Monaco

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        NORAA CONCRETE CONSTRUCTION CORP

 

            Location:         Lincoln: 12th Ave to 13th Ave

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/19/2012

            Time:                7:30am to 6:30pm

            Purpose:           ROW Construction

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Lincoln: 12th Ave to 14th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/19/2012

            Time:                7:30am to 6:30pm

            Purpose:           ROW Construction

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Louisiana: Logan to Washington

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/17/2012 ‑ End Date: 6/15/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Sewer

            Contractor:        BT CONSTRUCTION INC

 

            Location:         Lowell Blvd: Mexico to Florida

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/4/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:

            Contractor:        WATER BOARD

 

            Location:         Mariposa at 9th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 5/19/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        RANDY KNEEBONE EXCAVATING & TRUCKING INC

 

            Location:         Milwaukee intersection of E 26th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/30/2012 ‑ End Date: 8/3/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        WATER BOARD

 

            Location:         Milwaukee intersection of E 29th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        WATER BOARD

 

            Location:         Mississippi: Federal Blvd to Platte River Dr.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Mississippi: Federal Blvd to Zuni

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Mississippi: Zuni to Platte River Dr

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Monaco Pkwy at Narcissus Wy

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        EXCEL ENERGY‑SOUTHEAST METRO

           

            Location:         Monaco Pkwy: Tennessee to Exposition Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        NORAA CONCRETE CONSTRUCTION CORP

 

            Location:         Monaco: Belleview to Union

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 6/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        ValleyCrest Landscape Maintenance

 

            Location:         Park Ave: 19th Ave to Cleveland

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        W L CONTRACTORS INC

 

            Location:         Park Ave: Court to Glenarm

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        W L CONTRACTORS INC

 

            Location:         Park Ave: Downing to Emerson

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/25/2012

            Time:

            Purpose:           Traffic Signal Installation

            Contractor:        W L CONTRACTORS INC

 

            Location:         Park Ave: Ogden to Clarkson

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        W L CONTRACTORS INC

 

            Location:         Park Ave West: Larimer to Walnut

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm    Weekends 7:00am to 10:00pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/26/2012

            Time:                Weekends 7:00am to 10:00pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Patton Court: Exposition Ave. to Mississippi Ave.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/20/2012

            Time:                8:30am to 3:30pm

            Purpose:           Rotomill / Overlay

            Contractor:        STREET MAINTENANCE‑DEPT OF PUBLIC WORKS

 

            Location:         Pearl: Colorado Ave to Jewell

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/9/2012 ‑ End Date: 5/23/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Platte St: 15th to 16th

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/23/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Sewer

            Contractor:        COLORADO PIPE AND CONCRETE

 

            Location:         Speer Blvd S.B.: Kalamath to Stout

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Utility

            Contractor:        STURGEON ELECTRIC COMPANY INC

 

            Location:         Speer Blvd S.B.: Clarkson to Lafayette

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 5/20/2012

            Time:                4PM 5/19 ‑ 12PM 5/20

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

 

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 5/19/2012

            Time:                7P 5/18 ‑ 4P 5/19

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

 

            Location:         Speer Blvd S.B.: Corona to Lafayette

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 5/19/2012

            Time:                7P 5/18 ‑ 4P 5/19

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

 

            Location:         Syracuse St. ‑ 3201 north‑ north side of round‑a‑bout

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/29/2012

            Time:                8:30am to 3:30pm

            Purpose:           Fiber Optics

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Location:         Tufts Ave: DTC Blvd to Ulster

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Cable

            Contractor:        R C UTILITY CORPORATION

 

            Location:         Union Ave: Syracuse to Newport

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Close 3rd Traffic Lane

            Date:                Start Date: 10/28/2011 ‑ End Date: 8/31/2012

            Time:                24 hrs/day

            Purpose:           Bridge Construction

            Contractor:        EDWARD KRAEMER & SONS INC

 

            Location:         Union Ave E.B.: Quebec to Syracuse

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 9/23/2011 ‑ End Date: 8/31/2012

            Time:                24 hrs/day

            Purpose:           Bridge Construction

            Contractor:        Edward Kraemer & Sons, Inc

 

            Location:         Union Ave W.B.: Syracuse to Quebec

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 9/22/2011 ‑ End Date: 8/31/2012

            Time:                7a‑3:30p & 6p‑5a

            Purpose:           Bridge Construction

            Contractor:        Edward Kraemer & Sons, Inc

 

            Location:         University Blvd: Alameda to Columbia Pl.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/30/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Tree Trimming

            Contractor:        Colorado Tree Shrubbery Specialists

 

            Location:         University Blvd: 1st Ave to Alameda

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Bridge Construction

            Contractor:        STRUCTURES INC

 

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Bridge Construction

            Contractor:        STRUCTURES INC

 

            Location:         University Blvd: Evans to Warren

            Type:                Peak Lane Closure

            Date:                Start Date: 5/23/2011 ‑ End Date: 11/30/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        SHAW BUILDERS LLC

 

            Location:         Welton: 15th St. to 17th St.

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Welton: 26th to Downing

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/18/2012 ‑ End Date: 5/19/2012

            Time:                8pm 5/19 ‑ 8pm 5/19

            Purpose:           Special Event

            Contractor:        Colours TV

 

            Location:         Wewatta E.B.: 16th St to 19th St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         Wewatta W.B.: 19th St to 16th St

            Type:                Close 1st Traffic Lane, Peak Lane Closure

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         York: Colfax to 13th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         York at 40th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 5/21/2012

            Time:                8:30am to 3:30pm   No Weekends

            Purpose:           Pot Holing

            Contractor:        DENVER TRANSIT CONSTRUCTORS LLC

 

            Location:         Zuni: 27th to 29th

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MENDOZA DEMOLITION SERVICES INC

             

 

 

IMPORTANT: all information on this update is subject to change based on weather conditions.

 